A Tale of Two Bridges: The San Francisco–Oakland Bay Bridges of 1936 and 2013

★★★★★ 4.6 15 Bewertungen

€13.93
Preis bei Onlinekauf
Kostenloser Versand 30 Tage kostenlose Rückgabe

Verkauft und versendet von www.castellidiario.com.ar
Wir bemühen uns, Ihnen genaue Produktinformationen anzuzeigen. Hersteller, Lieferanten und andere stellen die hier gezeigten Angaben bereit.
€13.93
Preis bei Onlinekauf
Kostenloser Versand 30 Tage kostenlose Rückgabe

Wie möchten Sie Ihren Artikel erhalten?
Die ersten 30 Tage sind kostenlos! Wählen Sie den Tarif an der Kasse.
Versand
Ankunft 17.10.
Kostenlos
Abholung
In der Nähe prüfen
Lieferung
Nicht verfügbar

Verkauft und versendet von www.castellidiario.com.ar
30 Tage kostenlose Rückgabe Details

Produktdetails

Artikelnummer 233637004 Erscheinungsdatum 2026/06/27 Listenpreis €13.93 Modellnummer 233637004
Kategorie

A Tale of Two Bridges is a history of two versions of the San Francisco—Oakland Bay Bridge: the original bridge built in 1936 and a replacement for the eastern half of the bridge finished in 2013. The 1936 bridge revolutionized transportation in the Bay Area and profoundly influenced settlement patterns in the region. It was also a remarkable feat of engineering. In the 1950s the American Society of Civil Engineers adopted a list of the “Seven Engineering Wonders” of the United States. The 1936 structure was the only bridge on the list, besting even the more famous Golden Gate Bridge. One of its greatest achievements was that it was built on time (in less than three years) and came in under budget. Mikesell explores in fascinating detail how the bridge was designed by a collection of the best-known engineers in the country as well as the heroic story of its construction by largely unskilled laborers from California, joined by highly skilled steel workers. By contrast, the East Span replacement, which was planned between 1989 and 1998, and built between 1998 and 2013, fell victim to cost overruns in the billions of dollars, was a decade behind schedule, and suffered from structural problems that has made it a perpetual maintenance nightmare. This is narrative history in its purest form. Mikesell excels at explaining highly technical engineering issues in language that can be understood and appreciated by general readers. Here is the story of two very important bridges, which provides a fair but uncompromising analysis of why one bridge succeeded and the other did not. Read more

ASIN B06XWVH4NJ
XRay Not Enabled
ISBN13 978-0874174670
Edition 1st
Language English
File size 6.3 MB
Page Flip Enabled
Publisher University of Nevada Press
Word Wise Enabled
Print length 216 pages
Accessibility Learn more
Screen Reader Supported
Publication date April 3, 2017
Enhanced typesetting Enabled

Korrektur der Produktinformationen

Wenn Sie Unvollständigkeiten oder Fehler in den Produktinformationen auf dieser Seite bemerken, nutzen Sie bitte das Korrekturformular unten.

Korrekturanfrage

Kundenbewertungen

4.6 von 5
★★★★★
15 Bewertungen | 6 Rezensionen
So wird die Artikelbewertung berechnet
Alle Bewertungen anzeigen
5 Sterne
84% (13)
4 Sterne
3% (0)
3 Sterne
2% (0)
2 Sterne
1% (0)
1 Stern
10% (2)
Sortieren nach

Für dieses Produkt liegen derzeit keine schriftlichen Bewertungen vor.